TRANSPARENT PRICING — MATERIAL COST × 2 + SHIPPING & HANDLING
"MATERIAL" MEANS THE PART PLUS ITS SUPPORTS.
NO MINIMUM ORDER — ONE PART IS A JOB WE'LL TAKE.
// GET A NUMBER
QUOTE BUILDER
This is a volume-based estimator, not a slicer. A slicer computes wall paths, infill, supports and travel moves — material used is not proportional to volume, and print time follows path length, not volume at all. So the result is a band built from your part's stated volume and stated assumptions, and the team runs the real file before anything prints.
UPLOAD
.STL / .STEPMATERIAL
10 FAMILIESA sinterable stainless steel filament also exists — a specialist process with shrinkage to account for. It routes to the team, not the estimator; mention it in the notes.
INFILL
20%Infill is how solid the inside of the part is printed — 20% means a sparse internal lattice, 100% means solid plastic. It's the single biggest lever on both cost and strength, so it's your call, not our constant. 20% is fine for most brackets and enclosures.
QUANTITY
No minimum order — one part is a job we'll take. Per-part price × quantity; past a certain quantity, injection moulding is the better answer and the team will say so rather than take the job.
TOLERANCE
AGREED PER JOBTolerance varies by material and geometry, and shrinkage differs between plastics, so it's agreed per job rather than published as one number. This doesn't move the estimate — it moves the review.
SHIPPING
NOT IN THE FORMULASEND FOR REVIEW
OR WALK AWAYESTIMATE ONLY — NOT A PRICE. FINAL PRICING IS CONFIRMED BY OUR TEAM BEFORE ANYTHING IS PRINTED.
Submitting uploads the file and sends the estimate readout to the team; CDD responds within two business days. Or walk away — until you press this, nothing has left your machine.
